THEATRE ROYAL
The Challenge – Install actuators to smoke control windows and integrate with the natural ventilation system.
Working for Vaughan Engineering; William Brown & Co. were asked to install actuators and a control system to operate windows at the head of the new extension building stair. In addition the client required the space to be naturally ventilated via vents concealed behind the cladding panels, Wm Brown installed the control panels and worked closely with the BEMS contractor to deliver their specification.